• Xyq Hydraulic Tubing Power Tong and Spare Parts
  • Xyq Hydraulic Tubing Power Tong and Spare Parts
  • Xyq Hydraulic Tubing Power Tong and Spare Parts
  • Xyq Hydraulic Tubing Power Tong and Spare Parts
  • Xyq Hydraulic Tubing Power Tong and Spare Parts
  • Xyq Hydraulic Tubing Power Tong and Spare Parts

Xyq Hydraulic Tubing Power Tong and Spare Parts

Manufacturing Process: Forging
Surface Treatment: Spray-Paint
Operation Pressure: Atmospheric Pressure
Material: Cast Steel
Machine Type: Tubing Power Tong
Application1: Energy & Mining/Petroleum Machinery Parts
Customization:
Diamond Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Hot Sales Products
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
Tubing power tong
Transport Package
Wooden Box
Specification
CUSTOM MADE
Trademark
JX PETRO
Origin
Dongying
HS Code
84314310
Production Capacity
2000PCS/Month

Product Description

Product Description

Xyq Hydraulic Tubing Power Tong and Spare Parts

 

XYQ tubing power tong 

XYQ Series of Oil Pipe Power Tong is used for quick make-up/break-out tubing in well service and workover operation. The series of hydraulic power tongs adopt inner cam rolling-up clamping mechanism, with a hydraulic backup tong. The power tong with extra-long rod is available for backup tong to grip tubing body. The power tong also can be equipped with automatic torque control system.Feature 
1. Type planetary claws clamp
2. Type XQ140/20Y, XQ140/12X, XQ114/6YB, XQ89/3C available 
3. Adopt the braking belt, reliable braking
4. Application different range of tongs.
5. The backup tong can clamp the tubing body
6. Torque control system may be equipped according to customer's request

Specification 

Model XQ89/3C XQ114/6YB XQ140/12YA XQ140/20Y
Pipe size range of master tong φ60-89 φ60-114 φ73-140 φ60-140
23/8"-31/2" 23/8"-41/2" 27/8"-51/2" 23/8"-51/2"
Pipe size range of backup tong   φ60-114 φ60-114.5 φ73-156 φ60-156
23/8"-41/2" 27/8"-41/2" 27/8"-31/2" 23/8"-61/8"
High gear rated torque 1270N.m 1650N.m 2600N.m 2300N.m
937ft-lbs 1217ft-lbs 1918ft-lbs 1696ft-lbs
Low gear rated torque 3300N.m 6070N.m 12000N.m 20000N.m
2434ft-lbs 4477ft-lbs 8851ft-lbs 14751ft-lbs

Xyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare Parts

Hot Sales Products

Xyq Hydraulic Tubing Power Tong and Spare Parts

Company Profile

Xyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare PartsXyq Hydraulic Tubing Power Tong and Spare Parts

Packaging & Shipping

Xyq Hydraulic Tubing Power Tong and Spare Parts

FAQ

Xyq Hydraulic Tubing Power Tong and Spare Parts

1) How can I place order?

A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?

A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.

3) What's the order procedure?

A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?

A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?

A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.  

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now