Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Casing Cup Tester is mainly used for the pressure test on the casing string and blowout preventer stack. All of the oil (gas and water) well has been running in hole with casing and has been installing the mouth of wellhead equipment, to test pressure delamination one-off for casing and control blowout pressure system, also can be used to test pressure for casing at well site pipe yard. Test pressure very easy, provided the test pressure tool put in the casing.
1. Designed and manufactured according to API spec 7-1.
2. It used for the pressure test on the casing string and blowout preventer stack.
3. It can test pressure very easy, provided the test pressure tool put in the casing.
4. The rubber cup can stand high temperature and high pressure.
Type | Connection API | Size of Suitable Casing | OAL(in) | |
O.D.(in) | Wall Thickness (in) | |||
SYD104 | NC26 | 4-1/2 | 19/64 | 25-5/8 |
SYD125 | NC31 | 5-1/2 | 23/64 | 26 |
SYD128 | NC31 | 5-1/2 | 5/16 | 26 |
SYD157 | NC38 | 7 | 1/2 | 27-61/64 |
SYD183 | NC38 | 7-5/8 | 21/64 | 28-3/4 |
SYD206 | NC38 | 8-5/8 | 23/64 | 29-9/16 |
SYD222 | NC50 | 9-5/8 | 35/64 | 31 |
SYD261 | NC50 | 10-3/4 | 23/64 | 31 |
SYD320 | NC50 | 13-3/8 | 1/2 | 32-5/64 |
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.