• API 9A Oil Field Drilling Line Wire Rope
  • API 9A Oil Field Drilling Line Wire Rope
  • API 9A Oil Field Drilling Line Wire Rope
  • API 9A Oil Field Drilling Line Wire Rope
  • API 9A Oil Field Drilling Line Wire Rope
  • API 9A Oil Field Drilling Line Wire Rope

API 9A Oil Field Drilling Line Wire Rope

Certification: ISO, CCC, CE, API 9A
Surface: Galvanized
Technique: Galvanized
Application: Rope, Manufacturing, Construction
Alloy or Not: Alloy
Standard: BS, JIS, GB, ASTM, DIN, AISI
Customization:
Diamond Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Features
  • Product Parameters
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
all model
Machine Type
Wire Rope
Application1
Energy & Mining
Tensile Strength
1370-2160MPa
Diameter
8-50mm
Transport Package
Steel Frame Roll
Specification
as customer required
Trademark
JX PETRO
Origin
Dongying
HS Code
84314310
Production Capacity
3000 Ton/Tons Per Month

Product Description

Product Description

 

Drilling steel wire rope is made of steel wire around a central steel wire, and then twists by the rope stand around cable core. Most of drilling line are steel cable core, which is divided into the left-handed and right handed, Material grade is IPS, EIPS, and EEIPS etc. To choose the drilling line according to the hook load, most of model is 6*19S IWRC, diameter is Ø22mm- Ø 30mm, Standard is API 9A and ISO10425.

Except the drilling line, other line we also provide: 
9×19S+IWR, 9×19W+IWR, 9×21Fi+ IWR, 9×19S+9×7+Fc. 9×19W+9×7+Fc, 9×21Fi+9×7+Fc,8×19S+Fc, 8×19W+Fc, 8×25Fi+Fc 
IWRC 6×Fi(29),IWRC 6×WS(31),IWRC 6×WS(36) 34×7+Fc, 34×7+IWS, 36×7+Fc, 36×7+IWS17×7+Fc, 17×7+IWS, 18×7+Fc, 18×7+IWS, 18×19+Fc, 18×19+IWS18×19S+Fc, 18×19S+IWS, 18×19W+Fc, 18×19W+IWS Etc.


 

Features
  1. High metal filling factor and breaking force with a smoothly surface
  2. Best wear resistance, anti-extrusion performance
  3. Stability, long service time;
  4. Can use in drilling rig, workover drilling and operation etc.
Product Parameters

Type Diam. Met. area Met. Outer Wire IPS EIPS
in. mm. mm2 kg/m mm kN kN
18x7+FC 1/2 ~1 1/2 13.0~38.0  81~694  0.64~5.79 0.86~2.50 88~751  96~826 
19x7 1/2 ~1 1/2 13.0~38.0  86~733 0.67~6.07 0.86~2.50  88~751  96~826 
6x27H+IWRC 1~1 7/8 26~48 303~1031  2.81~9.90  1.86~3.43   439~1490 484~1640
6x30G+IWRC 1~2 26~52 303~1210 2.81~11.20 1.86~3.71 439~1680 484~1840
8x19S+FC 1/2~1 1/8 13.0~29.0 82~410 0.70~3.56 0.86~1.92 90~443 104~507
6x36SW+FC 3/4~2 19~52 146~1095 1.41~10.00 1.06~2.90 212~1420 233~1560
6x36SW+IWRC 3/4~2 3/8 19~60 172~1711 1.55~15.50 1.06~3.35 228~2130 262~1970
6x29Fi+FC 3/4~2 19~52 148~1111 1.41~10.00 1.06~2.90 212~1420 233~1560
6x29Fi+IWRC 3/4~2 1/8 19~54 173~1396 1.55~12.40 1.06~3.01 228~1710 262~1970
6x31SW+FC 3/4~2 19~52 146~1093 1.41~10.00 1.21~3.30 212~1420 233~1560
6x31SW+IWRC 5/8~1 7/8 16~48 119~1072 1.07~9.67 1.17~3.51 159~1350 183~1360
6x26SW+FC 3/4~1 7/8 19~48 142~909 1.41~8.80 1.39~3.51 212~1250 233~1220
6x26SW+IWRC 5/8~1 7/8 16~48 119~1072 1.07~9.67 1.17~3.51 159~1350 183~1360
6x25Fi+FC 7/8~2 22.0~48.0 198~1291 2.11~11.00 1.40~3.30 308~1630 354~1550
6x21S+FC 1/2~2 13~52.0 68~1091 0.63~10.00 0.96~3.85 95~1420 105~1050
6x19S+FC 1/2~1 3/4 13.0~45.0 68.7~823.0 0.63~7.66 1.03~3.58 95~1100 105~898
6x19S+IWRC 1/2~1 3/4 13.0~45.0 80.7~967.5 0.68~8.44 1.03~3.58 102~1180 118~1010
6x7+FC  3/8~7/8 9.50~22.00 33.1~177.6 0.31~1.71 1.00~2.35 52.1~273.0  -
5x7+FC  3/16~5/16 4.76~7.94 8.3~23.1 8.01~22.17 0.57~0.95 13.8~37.8 -
5x5+FC 5/32~5/16 3.97~7.94 5.8~23.1 5.15~20.54 0.60~1.19 8.9~34.7 -
Detailed Photos

API 9A Oil Field Drilling Line Wire Rope
API 9A Oil Field Drilling Line Wire Rope

API 9A Oil Field Drilling Line Wire RopeAPI 9A Oil Field Drilling Line Wire Rope

 

 

 

FAQ

API 9A Oil Field Drilling Line Wire Rope

1) How can I place order?

A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?

A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.

3) What's the order procedure?

A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?

A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?

A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now