Clamp-on Quick-latch Cementing Head
Through the champ-on quick-latch device ,it connect with casing and casing collar, that the camp-on quick-latch cementing head connected to the casing cementing operations to achieve. (size from 5-1/2inch to 13-3/8inch)
Clamp-on Quick-latch Single-plug Cementing Head |
Clamp-on Quick-latch Double-plug Cementing Head |
Features
- Though the clamp-on device on quick-acting coupling, connect with casing and casing collar, whatever buckle can be connected to implement cementing.
- The pipe manifold connection is union connection, it reduce labor intensity and improve the working speed, it also increased security.
- Increase rubber plug release indicator can easy to determine whether to release rubber plug, the baffle plate prominent than cementing head wall 30mm,with ale-mite in order to facilitate maintenance. Easy demolition of the release device.
- The connecting between pin block and body use the form of seal ring general cylindrical thread, salable with the use of a bearing structure of the double trapezoidal thread.
- Using a low torque valve.
Model |
5-1/2″ |
7″ |
9-5/8″ |
13-3/8″ |
T.P |
52.5Mpa |
42Mpa |
42Mpa |
28Mpa |
Cyi.ID |
140mm |
190mm |
245mm |
341mm |
Height |
1055mm |
1055mm |
1055mm |
1215mm |
Total Height |
1390mm |
1390mm |
1390mm |
1550mm |
Pipe Spacing |
330mm |
330mm |
330mm |
410mm |
Pipe to the Center Spacing |
715mm |
722mm |
750mm |
798 mm |
1) How can I place an order?
A: You can contact us by email about your order details, or place an order online.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details and production details by email or TM. Then we issue you a PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit them to our customer or replace them in the next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into the next step production procedure.