Customization: | Available |
---|---|
After-sales Service: | Online Services |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cyclone is to separate the two-phase or multi-phase mixture of liquid-liquid, liquid-solid, liquid-gas and so on with a certain density difference under the action of centrifugal force. The mixed liquid is tangentially flowed into the cyclone with a certain pressure, and a high-speed rotating flow field is generated in the cylindrical cavity.
Model | ZJ703J-D1S8NJ | ZJ703J-S2S12NJ | ZJ594J-S2S12NJ | ZJ703J-S3S16NJ | ZJ594J-S3S16NJ | |
Capacity(m³/h) | 120(528GPM) | 240(1056GPM) | 360(1584GPM) | |||
Desander Size(Inch) | 10 | |||||
Desander Qty(PCS) | 1 | 2 | 3 | |||
Desilter Size(Inch) | 4 | |||||
Desilter Qty(PCS) | 8 | 12 | 16 | |||
Working Pressure(Mpa) | 0.25 ~ 0.4 | |||||
InletSize(Inch) | 6 | |||||
Outlet Size(Inch) | 8 | |||||
Bottom Shaker Specs. | Shaker Model | ZS703J | ZS594J | ZS703J | ZS594J | |
Vibration Mode | Linear Motion | |||||
Motor(Kw) | 2×1.72 | |||||
Screen Qty(Pcs) | 3 | 4 | 3 | 4 | ||
Screen Size(mm) | 700×1250 | 585×1165 | 700×1250 | 585×1165 | ||
Screen Area( m²) | 2.63 | 2.73 | 2.63 | 2.73 | ||
Adjust G Force | ≤7.5G | |||||
Vibration Amplitude(mm) | 4.14 ~ 5.96 | |||||
Deck AngleRange | -1 ~ +5° | |||||
EX Standard | ExdIIBT4/IECEX/ATEX | |||||
Weight(Kg) | 1930 | 2235 | 2285 | 2328 | 2378 | |
Dimension: L×W×H(mm) | 2462×2042×1848 | 2462×2042×2147 | 2707×2042×2147 | 2462×2042×2147 | 2707×2042×2147 | |
The above specification and parameters for reference only. |
1) How can I place an order?
A: You can contact us by email about your order details, or place an order online.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details and production details by email or TM. Then we issue you a PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit them to our customer or replace them in the next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into the next step production procedure.