• Manual Tongs Handling Tools for Drilling
  • Manual Tongs Handling Tools for Drilling
  • Manual Tongs Handling Tools for Drilling
  • Manual Tongs Handling Tools for Drilling
  • Manual Tongs Handling Tools for Drilling
  • Manual Tongs Handling Tools for Drilling

Manual Tongs Handling Tools for Drilling

After-sales Service: 1 Years
Warranty: 1 Years
Manufacturing Process: Casting
Samples:
US$ 1/Set 1 Set(Min.Order)
| Order Sample
2-3/8--30inch
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Manual Tongs Handling Tools for Drilling pictures & photos
Manual Tongs Handling Tools for Drilling
US $1,500-3,500 / Set
Min. Order: 1 Set
Diamond Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • drawing sheet
  • company description
Overview

Basic Info.

Model NO.
all size
Surface Treatment
Spray-Paint
Operation Pressure
Atmospheric Pressure
Material
Cast Steel
Range
2-3/8--30
Standard
API 7K
Torque
15-135knm
Type
All Type
Transport Package
Wooden Box
Specification
1000*800*800
Trademark
JX
Origin
China
HS Code
8431431000
Production Capacity
800sets/Years

Packaging & Delivery

Package Size
1500.00cm * 1500.00cm * 1000.00cm
Package Gross Weight
500.000kg

Product Description

Product Description

The Manual tongs are necessary tools applied to make up and break out pipes. By changing the lug jaws and latch steps the manual tongs can hold different size of tongs.They are designed and manufactured according to API 7K for well drilling equipment.
The B type manual tongs are includes B type, SB type, and DB type, SDD,LF, Type C, workover tongs, WWC, WWB,AAX, Casing tong, Extended casing tons.

Product Parameters
Type Part No. Lug Law Size Torque
    in kN·m
Q89-432/90
Type B Manual Tong
1# 1 3.1/2"-6" 90
2 5"-7" 90
3 6"-8 1/4" 90
2# 1 8"-9 5/8" 90
2 10 5/8"-11 1/4" 90
3# 1 11 3/4"-12 3/4" 55
2 13 3/8"-14 3/8" 55
4# 2 16"-17" 55
Q86-324/75
Type B Manual Tong
5a 1 3 3/8"-4 1/8" 55
2 4 1/8"-4.5/8" 75
4 3/4"-5 1/4"
5b 1 4 1/4"-4 5/8" 75
4 3/4"-5 1/4"
2 5"-5./8" 75
5 1/2"-5 3/4"
3 6"-6 3/4" 75
5b1 1 5 1/4"-5 1/2" 75
5 9/16-5 3/4"
2 6"-6 5/8" 75
3 6 3/4"-8" 55
5c 1 6 5/8"-7 3/8" 75
2 7 3/8"-8" 75
3 8.1/2;8 5/8 55
5d 1 8.1/2"-9.5/8" 55
2 10 5/8"-10/3/4" 55
5e 1 11 3/4" 55
2 12 3/4" 55
Q340-648/35 9.8 13 3/8"-14 1/2" 35
8.7 14 1/2"-16" 35
8.9.9 16"-17 1/2" 35
8.9.7 17 1/2"-19" 35
7.8.7 19"-20" 35
9.8.9.7 20"-21 1/2" 35
9.7.8.7 21 1/2"-23" 35
9.9.8.7.7 24"-25 1/2" 35
9.8.7.7.7 25 1/2"-27" 35
8.7.7.7.7 27"-28 1/2" 35
9.9.8.7.7.8 28 1/2"-30" 35
9.7.7.7.7.8 30"-31 5/8" 35
Q340/8 4# 13 3/8(340mm,365mm) 8
(13 3/8Casing Hoop OD)
 
Q60-273/35 1# 2 3/8"-4 1/2" 35
2# 41/2"-6 1/2" 35
3# 6 1/2"-8 5/8" 35
4# 9 5/8"-10 3/4" 35
Q60-178/22 1# 2 3/8"-3 1/2" 22
2# 3 1/2"-5" 22
3# 4 3/4-"6 1/4" 22
4#   22
Q4-17/135 1 1 4"-5.1/2" 135
5 1/2"-5 3/4"
2 5 1/2"-6 5/8"
6 1/2"-7 1/4"
3 6 5/8"-7 5/8"
7 3/4"-8 1/2"
2 1 8 1/2"-9"
9 1/2"-10 3/4"
2 10 3/4"-12"
3 1 12"-12 3/4" 100
2 13 3/8"-14"
15"
4 2 15 3/4" 135
5 2 16" 80
17"
         
         
Type Part No.   Torque
      kN·m
Q60-273/27 1# 1 2 3/8"-3 1/2" 27
2# 2 2 7/8"-4 1/4"
3# 3 4"-5 3/4"
4# 4 5 3/4"-7" 20
5# 5 7 1/4"-8 5/8"
6# 6 9 5/8"-10 3/4" 14
Q2 3/8"-10 3/4"/48 1# 1 2 3/8"-3 3/4" 48
2# 2 3 1/2"-4 5/8"
3# 3 4 1/2"-5 3/4"
4# 4 5 1/4"-7 1/4"
5# 5 6 7/8"-8 5/8"
6# 6 9"-10 3/4" 35
Q2 7/8"-13 3/8"/75 1# 73-95.25MM 2 7/8"-3 3 3/4" 75
2# 88.9-114.3MM 3 1/2"-4 1/2"
3# 101.6-133.35MM 4"-5 1/4"
4# 127-184.15MM 5"-7 1/4"
5# 174.6-219.1MM 6 7/8"-7 5/8"
6# 228.6-273.05MM 9"-10 3/4" 40
7# 273.05-298.45MM 10 3/4"-11 3/4"
8# 339.7MM 13 3/8"
Detailed Photos

Manual Tongs Handling Tools for DrillingManual Tongs Handling Tools for Drilling

Manual Tongs Handling Tools for DrillingManual Tongs Handling Tools for Drilling
drawing sheet

Manual Tongs Handling Tools for Drilling

company description

Manual Tongs Handling Tools for DrillingManual Tongs Handling Tools for Drilling

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Manual Tongs Handling Tools for Drilling pictures & photos
Manual Tongs Handling Tools for Drilling
US $1,500-3,500 / Set
Min. Order: 1 Set
Diamond Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
35
Year of Establishment
2005-05-26