Customization: | Available |
---|---|
Standard: | API |
Material: | Alloy |
Still deciding? Get samples of US$ 350/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Repair kits for API 6A 2" 1502 plug valve / high-pressure plug valve
The plug valve is a necessary part that is utilized on the high-pressure manifold for the cementing and fracturing operations in oil fields and is also suitable to control similar high-pressure fluid. Featuring a compact structure, easy maintenance, small torque, rapid opening, and easy operation, the plug valve is ideal for cementing and fracturing manifolds.
Body of preventive maintenance and no need to be removed from the pipeline, no special tools required for removal, which can realize the online maintenance
Special plating technology on cock, make excellent abrasion resistance and anti-corrosive.
The switch of noil has an obvious logo and limit mechanism
Plug valves have many options for open device
Plug valve has a low torque performance, flexible operation of portable
Special sealing grease lubrication and sealing dual function.
S/N | Model | Description | Rated | WPEnd connection |
1 | SF42-1" | 1" plug valve | 6000psi | 2"male (LP) |
2 | SF70-1" | 1" plug valve | 10000psi | 2"male (LP) |
3 | SF105-1" | 1" plug valve | 15000psi | 2"male (LP) |
4 | SF105-1" | 1" plug valve | 15000psi | 2"union (F*M) |
5 | SF42-2" | 2" plug valve | 6000psi | 2" female (LP) |
6 | SF42-2" | 2" plug valve | 6000psi | 2"union (F*M) |
7 | SF70-2" | 2" plug valve | 10000psi | 2" female (LP) |
8 | SF105-2" | 2" plug valve | 15000psi | 2"union (F*M) |
9 | SF42-3" | 3" plug valve | 6000psi | 3"female (LP) |
10 | SF70-3 | 3" plug valve | 10000psi | 3"female (LP) |
11 | SF105-3 | 3" plug valve | 15000psi | 3"union (F*M) |
1) How can I place an order?
A: You can contact us by email about your order details, or place an order online.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are used.
3) What's the order procedure?
A: First we discuss order details and production details by email or TM. Then we issue you a PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit them to our customer or replace them in the next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into the next step production procedure.