Product Description
Hammer Union
Description:
Hammer Unions are designed as heavy duty, high pressure flow line connectors, which is commonly applied to chemical plants, on marine dredging vessels, in strip mines and in the oil industry. The color coding system on Hammer Unions represent the different configurations and pressure ratings.
Features:
- Provided with weak nitrile rubber sealing ring and used for sealing and protecting combination of union steel pairs.
- Recommended for connection of manifolds and pipe lines, vehicle-mounted system and mud transportation and also can be used as non-pressure seal union.
- Suitable for air, water, oil and gas service.
- Made of high quality steel by forging and finishing cut.\
- Adopts some end connections of pipeline thread, tubing thread, butt-weld.
Specifications:
Product Name |
Hammer Union, Weco Union |
Type |
Fig100, Fig200, Fig206, Fig300, Fig400, Fig402, Fig602, Fig1002, Fig1003, Fig1502 etc. |
Surface Color |
Yellow, Red, Blue, Orange, according to configuration and pressure |
Working Pressure Range |
1000~15000psi |
Size |
1" 2" 3" 4" 5" 6" 8" |
Application: |
Petroleum, chemical, machinery, electric power, shipbuilding, papermaking, construction, etc. |
Connection type |
Welded, Threaded |
Company Profile
Packaging & Shipping
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.