• Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor
  • Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor
  • Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor
  • Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor
  • Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor
  • Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor

Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor

Warranty: 18mths
Manufacturing Process: Forging
Surface Treatment: Without Processing
Operation Pressure: Atmospheric Pressure
Material: Cast Steel
Machine Type: Deadline Anchor
Customization:
Diamond Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Hot Sales Products
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
Deadline Anchor
Application1
Energy & Mining
Transport Package
Wooden Box
Specification
as customer required
Trademark
JX PETRO
Origin
Dongying
HS Code
84314310
Production Capacity
500 Piece/Pieces Per Month

Product Description

Product Description

Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline AnchorDeadline Anchor is a mechanism that converts deadline pull of a drilling rig into liquid pressure. It is one of the important components of weight indicating system, which can be used with JZG18.1.5 sensor made by the company to work as the primary instrument, and then makes a weight indicating system together with weight indicator and recorder. 
 

Technical Specifications 

1. Maximum deadline pull: 200kN 

2. Sensator: JZG18.1.5      

3. Error of output pressure f deadline anchor: ±1%       

4. Size: 1060mm×762mm×365mm      

5. Weight: 550kg      

6. Slickline diameter: Φ29mm,Φ26mm 


Specification:
Deadline Model Weight indicator
Model
Max. Deadline Pulling Force  
(kN)
Qty of the line Capacity
(kN)
Output pressure sensor
(MPa)






Vertical
JZG42 JZ500 420 12 5040 6
10 4200
JZG35 JZ400 350 12 4200
10 3500
JZG24 JZ250 340 10 2880
8 2400
JZG20 JZ200 200 10 2000
8 1600
JZG18A JZ150A 180 10 1800
8 1440
6 1080
JZG15A JZ100A 150 6 1200
4 900





Horizontal
JZG41 JZ500A 410 12 4920 6.83
10 4100
JZG34A JZ400B 340 12 4080 6
10 3400
JZG18 JZ150 180 8 1440
6 1080
JZG15 JZ100 150 8 1200
6 900
JZG10A JZ40 100 6 600
4 400
We can designed as your request.

Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline AnchorDeadline Anchor for Well Drilling, API Drilling Rig Parts Deadline AnchorDeadline Anchor for Well Drilling, API Drilling Rig Parts Deadline AnchorDeadline Anchor for Well Drilling, API Drilling Rig Parts Deadline AnchorDeadline Anchor for Well Drilling, API Drilling Rig Parts Deadline AnchorDeadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor

Hot Sales Products


Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor

Company Profile

Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline AnchorDeadline Anchor for Well Drilling, API Drilling Rig Parts Deadline AnchorDeadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor

Packaging & Shipping

Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor

FAQ

Deadline Anchor for Well Drilling, API Drilling Rig Parts Deadline Anchor

1) How can I place order?

A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?

A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.

3) What's the order procedure?

A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?

A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?

A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now