Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve

Product Details
Customization: Available
Manufacturing Process: Forging
Surface Treatment: Spray-Paint

360° Virtual Tour

Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
35
Year of Establishment
2005-05-26
  • Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve
  • Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve
  • Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve
  • Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve
  • Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve
  • Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve
Find Similar Products
  • Overview
  • Product Description
  • Hot Sales Products
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
Check Valve
Operation Pressure
Atmospheric Pressure
Material
Cast Steel
Machine Type
Drilling Check Valve
Application1
Energy & Mining/Petroleum Machinery Parts
Transport Package
Wooden Box
Specification
CUSTOM MADE
Trademark
JX PETRO
Origin
China, Shangdong
HS Code
84314310
Production Capacity
2000PCS/Month

Product Description

Product Description

Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock ValveFlow Line Check Valve

Description:
Check Valves are installed in high pressure lines to stop reverse flow by the automatic close of flapper or dart.
Flapper check valves include top-entry check valves and in-line flapper check valves, which allow fluids to flow towards the wellbore and prevent flowing backwards. For dart check valves, the flow will open the dart by overcoming the small spring force.
When the flow runs in opposite direction, the spring will push the dart against the seat retainer to prevent reverse flow.
We provides both standard and reverse-flow check valves. And we have also developed check valves for sour service in accordance with NACE MR0175.

Features:

  1. Check valves are suitable for isolating completion fluid, high pressure processing and rig equipment repairing.
  2. The surface of valve internal baffle is covered with nitrile-butadiene rubber to extend life.
  3. The thread and the joint of ball face adopts America standard.
  4. The valve is casted by hard alloy steel and adopts union connection.

Specifications:
Product Name High pressure check valve
Material Class AA-EE
Working Media Crude oil and natural gas
Processing Standard API 6A
Working Pressure 3000 ~ 15000psi
Processing Type Forge 
Performance Requirement PR1-2
Product specification level PSL1-3
Nominal Bore Diameter 2", 3"
Connection Type Union, BOX thread, Pin thread
Types  Flapper, Dart
Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock ValveFmc Weco 1502 Plug Valve/Low Torque Valve/Cock ValveFmc Weco 1502 Plug Valve/Low Torque Valve/Cock ValveFmc Weco 1502 Plug Valve/Low Torque Valve/Cock ValveFmc Weco 1502 Plug Valve/Low Torque Valve/Cock ValveFmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve
Hot Sales Products

 

Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve

Company Profile

Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock ValveFmc Weco 1502 Plug Valve/Low Torque Valve/Cock ValveFmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve

Packaging & Shipping

Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve

FAQ

Fmc Weco 1502 Plug Valve/Low Torque Valve/Cock Valve

1) How can I place order?

A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?

A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.

3) What's the order procedure?

A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?

A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?

A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.  

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now