Customization: | Available |
---|---|
After-sales Service: | Online Services |
Warranty: | One Year |
Still deciding? Get samples of US$ 800/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
JQHS series air winch is driven by air motor,though gear reduction organization to drive drum,accomplish the traction and hoist function.
1. Piston type air motor used the double supporter design;
2. Operation rod can be adjusted infinite speed variation;
3. Main parts used the high strength steel;
4. Wire line can be provide
5. Design and produce according to the API 7K standard
Hydraulic Winch
Model | YJ-3 | YJ-5 | |
Flow rating | L/min | 120 | 120 |
gpm | 31.7 | 31.7 | |
Pressure rating | MPa | 16 | 18 |
psi | 2310 | 2610 | |
Max. pull | kN | 30 | 50 |
US ton | 3.3 | 5.5 |
Pneumatic Air Winch
Model | QJL 0.5/40(A) | QJ0.5/120(A) | QJ1/100(A) | QJ3/200(B) | QJ5/220(B) | QJ5/220(B) | |
Air Pressure | Mpa | 0.5-0.9 | |||||
Psi | 72-130 | ||||||
Max. Pull | kN | 5 | 10 | 30 | 50 | ||
ton | 0.55 | 1.1 | 3.3 | 5.5 | |||
Max. Line Speed | m/min | 12 | 24 | 12 | 35 | 20 | 12 |
Ft/min | 39.3 | 78.6 | 39.3 | 114.8 | 65.6 | 35.3 | |
Rope Storage | M | 40 | 120 | 100 | 200 | 120 | 220 |
ft | 131 | 393 | 328 | 656 | 393 | 720 | |
Wire rope dia. | Mm | 8 | 11 | 15.875 | 19 | ||
in | 5/16 | 7/16 | 5/8 | 3/4 |
1) How can I place an order?
A: You can contact us by email about your order details, or place an order online.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details and production details by email or TM. Then we issue you a PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit them to our customer or replace them in the next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into the next step production procedure.