Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Manual tongs are necessary tools applied to make up and break out pipes. By changing the lug jaws and latch steps the manual tongs can hold different size of tongs.They are designed and manufactured according to 7K spec. for well drilling equipment.
The B type manual tongs are includes B type, SB type, and DB type, SDD, LF, Type C, workover tongs, WWC, WWB, AAX, Casing tong, Extended casing tons.
The available range of manual tongs is from 2-3/8 ~10-3/4 inches. C Manual Tongs are also known as HT 35 Manual Tongs.
No. of Latch Lug Jaw |
No. of Short Jaw |
No. of Hinge Jaw |
Size Range | Rated Torque | |
in | mm | kN·m | |||
1# | 1# | / | 2-3/8 ~ 3.668 | 60.33 ~ 93.17 | 48 |
2# | 2-7/8 ~ 4-1/4 | 73.03 ~ 108 | |||
3# | 3-1/2 ~ 5-1/4 | 88.9 ~ 133.35 | |||
4# | 5-1/2 ~ 7 | 139.7 ~ 177.8 | |||
5# | 2# | 1# | 7 ~ 8-5/8 | 177.8 ~ 219.08 | |
6# | 2# | 9-5/8 ~ 10-3/4 | 244.5 ~ 273.05 |
Manual Tong Type C
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.