Customization: | Available |
---|---|
After-sales Service: | Online Services |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This new-generation improvement in metal-bladed scraper design brings even the most complex wellbore cleanups under control. The RAZOR BACK (RB) tool has critically important features not found on any other metal-bladed casing scraper that render it more effective, robust, and safer to use in wellbore cleanup and scraping operations.
Advantages: The lantern is self-centralizing inside the tubular to ensure equal cleaning force at all angles of well inclination. The mandrel rotates through the stabilizer sleeves and lantern to avoid wear or damage to the casing during pipe rotation. The tool is HTHP-compatible and is not vulnerable to chemical or acid attacks.
The HEAVY-DUTY RAZOR BACK tool is run with a maximum running-in-hole and pulling-out-of-hole speed of 150 ft/min [46 m/min] and should be positioned at least 30 ft [9 m] above the drill bit or mill. The string should be picked up off the bottom and circulated regularly to clear any accumulation of debris.
Where possible, the bit or mill OD should be greater than the stabilizer sleeve OD of the tool. If this is not possible, it is recommended that a full-gauge mill be run below the first HEAVY-DUTY RAZOR BACK tool in the bottom-hole assembly.
RAZOR BACK Tool Operating Parameters | |||
Tool and Casing Size, in; | Maximum Rotating Speed in Tension, rpm | Maximum Rotating Speed in Compression, rpm | Maximum Compression at Tool When Rotating, lbm |
3 1/2 | 60 | 60 | 3,000 |
4 1/2-5 1/2 | 90 | 90 | 5,000 |
6 5/8-8 5/8 | 120 | 120 | 10,000 |
9 5/8-13 3/8 | 120 | 120 | 15,000 |
16-20 | 100 | 100 | 50,000 |
1) How can I place an order?
A: You can contact us by email about your order details, or place an order online.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are used.
3) What's the order procedure?
A: First we discuss order details and production details by email or TM. Then we issue you a PI for your confirmation. You will be requested to do a prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit them to our customer or replace them in the next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into the next step production procedure.