Customization: | Available |
---|---|
After-sales Service: | Online Services |
Warranty: | One Year |
Still deciding? Get samples of US$ 2000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tong torque system consists of tong torque load cell, tong torque gauge (installed in the driller display), and hydraulic hose.Load cell installed in the wire line of the power tong, when the drill pipe screws, it will be the pulling force which is proportional with the tightening torque on the wire line rope. This pulling force act on hydraulic fluid through piston of load cell, connect wire line to transmit on the bourdon tube of the gauge.The bourdon tube moves, it makes the pointer through the movement, then indicates the force of the power tong.Use power tong or casing tongs, May not use load cells, connects wire line in power tong or in casing tongs hydraulic pressure source directly.
CTP Series |
Indicates make-up or breakout torque (in pounds of line pull) for all oilfield tubulars. |
6" fluid filled gauge. |
Operator adjustable target pointer that the driller sets to a corresponding torque requirement. |
Models and variations of available to work with all manual tongs. |
Capacity ranges from 10,000 pounds to 30,000 pounds of line pull. |
CTT Series |
Indicates torque in foot pounds applies to each joint when using power tongs to run oilfield tubulars. |
Models available for all makes and models of power tongs. |
Tension or Compression style load cells available for use in all power tong configurations. |
Wide variety of capacities available to suit all applications and tong configurations. |
English, Metric or dual scale variations available. |
To order specify |
CTP or CTT series |
Tong make and model as well as dial capacity and scale required. |
Box Mount or Panel Mount. |
Hose length required if different than standard (5' for CTT series standard and 25' for CTP series standard). |
Tension or compression type load cell. |
1) How can I place an order?
A: You can contact us by email about your order details, or place an order online.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are used.
3) What's the order procedure?
A: First we discuss order details and production details by email or TM. Then we issue you a PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit them to our customer or replace them in the next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into the next step production procedure.