Customization: | Available |
---|---|
After-sales Service: | Online Services |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Sucker rod guide/ centralizer is a kind of downhole tools which is pumping well anti-abrasion, it is especially suitable for pumping well and directional well whcih above of sucker rod middle point,under the middle point of sucker rod , the rod body with nylon centralizer is works better. There are several types, Two pieces (separately), Snap on; twist on, and wheel type.
The sucker rod moves up and down in the tubing, due to the elastic deformation of sucker rod, rod and oil tube wall is easy to make friction, ti makes sucker rod break off easily, sucker rod centralizer has strong flexibility, touched with the tubing wall can reduce the friction of rod and tube, and can be increase production life of pumping unit. The centralizer is connected with sucker rod , the outsid diameter of centralizer is bigger than coupling outer diameter,so that can make the function of centralize. The centralizer is made of high strength wear-resistant material, and touched with the tubing to reduce the abrasion to achieve the purpose of anti-abrasion.
Feature:
1.Precondition: To ensure that the temperature of the workshop is not less than -20ºC.
2.Drying: the raw material is dried in 100ºC hot air, making its humidity less than 0.1%.
3.Equipment debugging: power and water supply of equipment,then install the mould, cleaning equipment and raw material barrel.
4.Raw material melt: the melting temperature of HTN51G35HSLR.
5.Mold temperature: the mold temperature of the processed HTN51G35HSLR material is 145ºC, and the mold temperature of the processed HTN53G50HSLR is 100ºC.
6.Processing: the nozzle temperature is 290 ºC, plasticizing area one temperature is 285 ºC,plasticizing area two temperature is 275 ºC, plasticizing area three temperature is 260 ºC, injection pressure is 110 bar, flow is 90 cc/min.
7.After the first product is produced, it will be testing the size, and the batch production will be start after the testing.
APPLICATION | MAXIMUM ROD LOAD | DIMENSIONS A(INCH) | DIMENSIONS B(INCH) | DIMENSIONS C(INCH) | WEIGHT |
2058P 5/8″ Rod / 2-3/8″ Tubing | 19,600 | 1.5 | 27 | 1.8 | 10lbs |
2034P 3/4″ Rod / 2-3/8″ Tubing | 19,660 | 1.5 | 27 | 1.8 | 10lbs |
2558P 5/8″ Rod / 2-7/8″ Tubing | 19,600 | 1.5 | 27 | 2.25 | 10lbs 2oz |
2534P 3/4″ Rod / 2-7/8″ Tubing | 19,600 | 1.5 | 27 | 2.25 | 10lbs |
2578P 7/8″ Rod / 2-7/8″ Tubing | 22,400 | 1.625 | 27 | 2.25 | 11lbs 5oz |
3034P 3/4″ Rod / 3-1/2″ Tubing | 19,600 | 1.5 | 29 | 2.75 | 12lbs 6oz |
3078P 7/8″ Rod / 3-1/2″ Tubing | 22,400 | 1.75 | 29 | 2.75 | 15lbs |
3010P 1″ Rod / 3-1/2″ Tubing | 35,000 | 2 | 29 | 2.75 | 19lbs |
PA66
Item | Specification | Technical Requirements | PA66 |
1 | Testing Item | Smooth and Without Damage | Smooth |
2 | Bending Strength Mpa | >=103 | 242.46 |
3 | Notch Impact Strength | >=13 | 27.66 |
4 | Friction Coefficient μ | <=0.018 | 0.0173 |
5 | Heat Distortion Temperature ºC | >=180 | 220.85 |
6 | Wear Volume Loss g/cm³ | >=0.073 | 0.0049 |
7 | Density kg/cm³ | 1.3-1.4 | 1.4 |
8 | Tensile MPa | 123.05 | |
9 | Compactness | 1500 |
PPA Resin
Item | Specifications | Technique Data | PPA Resin |
1 | Appearance | Smooth and Without Damage | Smooth |
2 | Bending Strength Mpa | >=103 | 352.26 |
3 | Notch Impact Strength | >=13 | 13 |
4 | Friction Coefficient μ | <=0.018 | 0.1845 |
5 | Heat Distortion Temperature ºC | >=180 | 275.5 |
6 | Wear Volume Loss g/cm³ | >=0.073 | 0.0182 |
7 | Density kg/cm³ | 1.3-1.4 | 1.4 |
8 | Tensile MPa | 208.87 | |
9 | Compactness | 1500 |
1) How can I place an order?
A: You can contact us by email about your order details, or place an order online.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are used.
3) What's the order procedure?
A: First we discuss order details and production details by email or TM. Then we issue you a PI for your confirmation. You will be requested to do a prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit them to our customer or replace them in the next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into the next step production procedure.